Walls define living spaces while offering privacy for baths, bedrooms as well as direct the foot traffic and create the functional floor plans. During the initial construction phase, most walls go up, and framing contractors use precut walls and standard stud spacing.  For interior wall building, there are two steps involved: The 1st step is the construction of the wall frame when it lies on the floor, and the 2nd step is standing it up and attaching it. And, when it comes to building walls in an existing room, it involves framing the wall in place.

  1. Partition walls or load-bearing walls? Almost all exterior walls are load-bearing, which means they bear the weight of the structure above. In case of load-bearing walls, it transfers the load through the lower walls to the ground. Interior wall building in Perth consists of both the load-bearing as well as non-load bearing walls. Both types of walls employ similar framing standards, although load-bearing walls are typically located directly above another load-bearing wall, another structural wall or a beam. Here are a few parameters to look for while building walls.
  2. Wall height: Standard ceiling height is 8 feet from the finished floor to the underside of the ceiling drywall. Wall studs are precut for the framing walls along with standard sub spacing. An 8-foot stud is 92 and 5/8 inches long, and the standard interior wall consists of the floor plate. The floor plates are 1½ inches high, whereas 2 ceiling plates add an additional 3 inches to the wall height. You will get rough-framed wall height of 97 and 1/8 inches. By adding ½-inch drywall and floor finish, you will get the final floor height, which should be close to 8 foot.
  3. Wall thickness: A 2/4 wall stud come with 3 ½ inches of wideness, moreover interior wall typically has ½-inch drywall installed on both sides that increase the thickness up to 4 ½ inches. However, walls that contain plumbing should be thicker than standard walls. 2/6 wall studs are ideal having larger stud space for air ducts running, drainpipes or other mechanical elements.
  4. Construction methods: In new construction, walls are often framed lying down and then the builder stands up the wall unit that attaches it to the adjoining walls and floor joists. During the remodelling, walls are often framed in place, where the bottom plate is set to the floor and single top plate attachment to the ceiling joists.

Professionals for Interior wall building in Morley take precise measurement using a measuring tape, framing square and chalk line for the wall placement on the subfloors. When it comes to framing an interior wall in the basement, the bottom wall plates are chemically treated to resist moisture damage.